Bathroom Remodel: Step 4 – Finish cement board & flashing

mac software download he rest of the cement board was installed, Sweats à Capuche Jordan 13 Sale as well as the TileRedi flashing kit, UCLA Bruins Canotte Denver Nuggets that goes over the lip of the pan, Canada Goose Chilliwack Bomber Under Armour Ua Curry 3 and behind the board. Parajumpers Kodiak Cheap Nike Air Max Shoes UK We used QuickShelf shampoo inserts that helped ensure water and moisture within the cutouts wouldn’t penetrate.... Read More

Bathroom Remodel: Step 3 – TileRedi Shower Pan

The shower pan dictated much of the work ahead of us. Getting the walls ready for tile meant installing Hardiebacker cement board on the walls and also on the floors where tiling was required.  The pan needed to be installed to finish up plumbing, cement board, and seams where the shower curb would hit the floor, and where the wall shower tile would hit the regular drywall outside the shower.In the past, we’ve fabricated custom concrete shower... Read More