Bathroom Remodel: Step 2 – Repair

After the initial demo, Georgia Bulldogs Nike Air Max 2017 Heren grijs we needed to get rid of all the bad wood and put in new lumber. Air Jordan 9 Retro The one inch subfloor was cut out using a circular saw in a size that was easily replaceable. Air Jordan 8 (VIII) nike air max goedkoop New studs on two walls were replaced, Parajumpers parka and additional subfloor framing were added to ensure the new shower pan would sit on a solid foundation.... Read More